PENNSYLVANIA | Just after Thanksgiving 2018, Wolfe House Movers / Buckingham Transport met this transformer at a rail siding, trans-loaded it onto 12 lines of Goldhofer, hauled it 5 miles to the substation, and set it onto its new foundation pad. With a significant incline in the route, the ADDrive Powerpack on the Goldhofer was hooked up and used to power the load slowly up the mountain to the substation. Once there, we used our Buckingham Equipment Synchronized Hydraulic Jack & Slide System to off-load the transformer and lower it to the pad.