BUCKINGHAM HEAVY TRANSPORT — Your Heavy Haul Experts
  • Home
  • Services
    • Specialized Transport
    • Heavy Haul
    • Engineered Lifting & Rigging
  • Equipment
  • Projects
  • About Us
  • Careers
  • Contact Us

Prefab Substation Control Building Delivery

Contact Us For A Quote

Buckingham contracted to move two sections of a modular substation control building into position on cement piers. Each section weighed approximately 32,000 pounds. We used Buckingham Toe Jacks to lift the sections from the trailer and support them in place while the trailer was removed, then used steel beams and rollers to slide the units into place over the foundation piers.
Back to Projects
Phone: (610) 488-8969
​Email: [email protected]
Buckingham Heavy Transport
  • Home
  • Services
    • Specialized Transport
    • Heavy Haul
    • Engineered Lifting & Rigging
  • Equipment
  • Projects
  • About Us
  • Careers
  • Contact Us