Buckingham Transport mobilized to the port of Virginia to load this 125,000-lb reactor from the mafi to six lines of Goldhofer SPMT. After securing the cargo, we hauled it 70 miles to a power generator facility, where we used the Buckingham Jack and Slide to transload the reactor to a temporary foundation pad.