Buckingham Heavy Transport contracted to deliver three transformers from the rail sidings to two energy facilities several miles away. The transformers weighed 373,000 lbs and were 16½' tall. We used 12 lines of Goldhofer ADDrive and THP/SL with the Goldhofer transformer deck, which gave us better clearance for the wires along the routes. At the substations, we utilized the Buckingham jack & slide system to offload the transformers to their temp pads.